On Monday, September 10, 2012, the Florida Department of Transportation (FDOT) will begin a roadway project on State Road (SR} 5/US 1/0verseas Highway from MM 14.616 to MM 15.261in the Saddlebunch Keys. This project will last about 2 months.
LANE CLOSURES & WORK SCHEDULE
• Occasional single lane closures will occur during non
peak hours, 8 p.m. to 6 a.m. Sunday through Friday.
• Lanes will not be closed on Saturday, holidays or during special events as determined by the project engineer.
PROJECT SCHEDULE
September 10, 2012 through November 8, 2012
WORK TO BE PERFORMED
CONSTRUCTION
• Milling and resurfacing of the roadway
• New roadway striping
• Signage updates